What we prepare.
Which approvals your product needs, which tests they require and where the design falls short, before you spend money on testing.
A plan that matches the standards behind each approval, and coordination with an independent accredited lab.
Engineering evaluations and calculations that extend tested products to other sizes, anchors or configurations.
Drawings, installation instructions, test reports and calculations assembled in the format the approving body expects.
Approvals we pursue.

Any product that forms part of the building envelope, or gets mounted to it, needs approval before it can be specified and installed in these markets.
Statewide approval under the Florida Building Commission system. A product gets approved through a validation method such as a test report or a sealed engineering evaluation.
Notice of Acceptance for the High Velocity Hurricane Zone. Its testing and review rules are stricter than the statewide system, including large-missile impact and cyclic pressure testing.
Product evaluation for windstorm-designated catastrophe areas along the Texas coast.
Safety listings for electrical equipment and certification for solar thermal collectors and systems, mapped alongside the building approvals.
Who this is for.
Impact and non-impact units, storefront systems and exterior protection sold into hurricane regions.
Roof systems, components, connectors and fastening products that resist wind uplift.
Racking, roof attachments, modules, inverters, battery systems and enclosures entering the U.S. market.
Companies outside the U.S. that need a clear map of the codes, listings and state approvals before they ship.
How it works.
Each product is different, so we scope the path before testing starts. The steps below are the usual order.
Drawings, specifications, existing test reports or listings, the intended use and the markets you want.
We identify the approvals that apply, the standards behind each, and the changes to the design that testing is likely to expose.
We write the test plan, work with the independent lab on specimens and protocols, and review the results.
Sealed engineering evaluations extend the tested configurations to the sizes, anchors and substrates you intend to sell.
We assemble the package and send it to the approving body, which is the state system, Miami-Dade or TDI depending on the approval.
If the reviewer comments, we answer with revised drawings, added calculations or a retest plan.
Approvals and NOAs have renewal and revision requirements. We help you keep them current and add product variants.
Codes, standards and approving bodies.
Which rules apply depends on the product and where it will be installed.
Sets the wind and impact criteria for products used in Florida. The 8th Edition (2023) applies through December 30, 2026. The 9th Edition (2026) is scheduled to take effect December 31, 2026. Check which edition governs your submittal.
Miami-Dade and Broward require products to carry an NOA, with testing protocols that include large-missile impact and cyclic pressure loading.
Design pressures come from ASCE 7. Product ratings come from structural, impact and cycling tests run under the standards the approving body names.
Solar and storage equipment is reviewed against the National Electrical Code and NFPA requirements. Florida uses the 2020 NEC through December 30, 2026 and the 2023 NEC from December 31, 2026.
Outside Florida, the International Building Code and state-level codes set the structural and fire requirements that your documentation has to answer.
Products used in the designated catastrophe areas follow the Texas Department of Insurance evaluation process.
Problems we solve or prevent.
A feasibility review catches design gaps on paper. That is cheaper than failing a test and building new specimens.
Reviewers return packages with missing drawings, mismatched calculations or unclear installation instructions. We check the package against the approving body's requirements before it goes in.
A tested baseline can be extended by sealed evaluation, so your catalog is not limited to the exact specimens that were tested.
Installers cannot use a product that is not approved. A listed product keeps your customers' permits moving.
Product development support.
We also help bring a product to a testable state. Our team provides product improvement analysis, 3D modeling and manufacturing drawings, including extrusion die drawings, to check manufacturing feasibility, build prototypes and test fit.
A structural review of the design to find what will limit its rated pressure before testing.
Models for fit checks and prototypes.
Drawings a fabricator can build from, including extrusion dies.
Florida Product Approval is the statewide system. A Miami-Dade Notice of Acceptance is issued locally for the High Velocity Hurricane Zone, which is Miami-Dade and Broward, and its testing and review rules are stricter. A product can hold one, the other or both.
No. Testing is done by an independent accredited laboratory. We write the test plan, coordinate with the lab, and review the results. We then prepare the evaluation reports and the submittal that rely on them.
Sometimes. Once a product has a tested baseline, a sealed evaluation can cover small changes such as a different size or finish, if the change stays inside what the testing supports. A new design with no test history normally needs testing first.
Coastal Texas has windstorm-designated catastrophe areas where certain exterior products need to be evaluated and listed for use. We prepare the submittal to the Texas Department of Insurance for manufacturers who sell into those areas.
Yes. Racking and roof attachments, PV modules and inverters, battery energy storage and balance of system equipment all go through certification and code review. UL listings and SRCC certification for solar thermal are part of the path we map for you.
Yes. The first step is a feasibility review that names the approvals that apply, the tests they require and the gaps in your design. You decide whether to continue after you see it.
Send drawings, specifications, any existing test reports or listings, the target markets, and the product's intended use. Tell us which approvals you want. We confirm the scope and what else we need.
Yes. We help manufacturers outside the U.S. understand which U.S. codes, listings and state approvals their product needs, and in what order to pursue them.
Start your approval path.
Contact us to schedule your initial consultation and take the first step toward U.S. market entry.
Related services and guides.
Approvals connect to the engineering that follows them in the field.