Product Certification Consulting

SunSmart Engineering helps manufacturers get building products approved for sale in the U.S., with a focus on Florida Product Approval, Miami-Dade Notice of Acceptance and Texas Department of Insurance approval. We serve makers of windows, doors, roofing, structural connectors, shutters, solar racking, modules and storage equipment, here and abroad. You send the product data. We plan the testing, prepare the sealed evaluations and calculations, and assemble the submittal.

01

What we prepare.

01
Feasibility review

Which approvals your product needs, which tests they require and where the design falls short, before you spend money on testing.

02
Test plan and lab coordination

A plan that matches the standards behind each approval, and coordination with an independent accredited lab.

03
Sealed evaluation reports

Engineering evaluations and calculations that extend tested products to other sizes, anchors or configurations.

04
Submittal package

Drawings, installation instructions, test reports and calculations assembled in the format the approving body expects.

02

Approvals we pursue.

Architectural blueprints on a desk with drafting tools

Any product that forms part of the building envelope, or gets mounted to it, needs approval before it can be specified and installed in these markets.

Florida Product Approval

Statewide approval under the Florida Building Commission system. A product gets approved through a validation method such as a test report or a sealed engineering evaluation.

Miami-Dade NOA

Notice of Acceptance for the High Velocity Hurricane Zone. Its testing and review rules are stricter than the statewide system, including large-missile impact and cyclic pressure testing.

Texas Department of Insurance

Product evaluation for windstorm-designated catastrophe areas along the Texas coast.

UL and SRCC listings

Safety listings for electrical equipment and certification for solar thermal collectors and systems, mapped alongside the building approvals.

03

Who this is for.

01
Window, door and shutter makers

Impact and non-impact units, storefront systems and exterior protection sold into hurricane regions.

02
Roofing and structural product makers

Roof systems, components, connectors and fastening products that resist wind uplift.

03
Solar and storage manufacturers

Racking, roof attachments, modules, inverters, battery systems and enclosures entering the U.S. market.

04
International manufacturers

Companies outside the U.S. that need a clear map of the codes, listings and state approvals before they ship.

04

How it works.

Each product is different, so we scope the path before testing starts. The steps below are the usual order.

01
Send the product data

Drawings, specifications, existing test reports or listings, the intended use and the markets you want.

02
Feasibility review

We identify the approvals that apply, the standards behind each, and the changes to the design that testing is likely to expose.

03
Test plan and lab coordination

We write the test plan, work with the independent lab on specimens and protocols, and review the results.

04
Evaluations and calculations

Sealed engineering evaluations extend the tested configurations to the sizes, anchors and substrates you intend to sell.

05
Submittal

We assemble the package and send it to the approving body, which is the state system, Miami-Dade or TDI depending on the approval.

06
Comments, revisions and resubmission

If the reviewer comments, we answer with revised drawings, added calculations or a retest plan.

07
Maintain the approval

Approvals and NOAs have renewal and revision requirements. We help you keep them current and add product variants.

05

Codes, standards and approving bodies.

Which rules apply depends on the product and where it will be installed.

Florida Building Code

Sets the wind and impact criteria for products used in Florida. The 8th Edition (2023) applies through December 30, 2026. The 9th Edition (2026) is scheduled to take effect December 31, 2026. Check which edition governs your submittal.

HVHZ rules

Miami-Dade and Broward require products to carry an NOA, with testing protocols that include large-missile impact and cyclic pressure loading.

ASCE 7 and test standards

Design pressures come from ASCE 7. Product ratings come from structural, impact and cycling tests run under the standards the approving body names.

Electrical and fire codes

Solar and storage equipment is reviewed against the National Electrical Code and NFPA requirements. Florida uses the 2020 NEC through December 30, 2026 and the 2023 NEC from December 31, 2026.

IBC and state codes

Outside Florida, the International Building Code and state-level codes set the structural and fire requirements that your documentation has to answer.

Texas windstorm requirements

Products used in the designated catastrophe areas follow the Texas Department of Insurance evaluation process.

06

Problems we solve or prevent.

01
Testing a product that was never ready

A feasibility review catches design gaps on paper. That is cheaper than failing a test and building new specimens.

02
Submittals sent back for comments

Reviewers return packages with missing drawings, mismatched calculations or unclear installation instructions. We check the package against the approving body's requirements before it goes in.

03
An approval that covers too few sizes

A tested baseline can be extended by sealed evaluation, so your catalog is not limited to the exact specimens that were tested.

04
Contractors stuck without an approval

Installers cannot use a product that is not approved. A listed product keeps your customers' permits moving.

07

Product development support.

We also help bring a product to a testable state. Our team provides product improvement analysis, 3D modeling and manufacturing drawings, including extrusion die drawings, to check manufacturing feasibility, build prototypes and test fit.

Product improvement analysis

A structural review of the design to find what will limit its rated pressure before testing.

3D modeling

Models for fit checks and prototypes.

Manufacturing drawings

Drawings a fabricator can build from, including extrusion dies.

+FAQ

Product approval questions.

Have a different question?

Florida Product Approval is the statewide system. A Miami-Dade Notice of Acceptance is issued locally for the High Velocity Hurricane Zone, which is Miami-Dade and Broward, and its testing and review rules are stricter. A product can hold one, the other or both.

No. Testing is done by an independent accredited laboratory. We write the test plan, coordinate with the lab, and review the results. We then prepare the evaluation reports and the submittal that rely on them.

Sometimes. Once a product has a tested baseline, a sealed evaluation can cover small changes such as a different size or finish, if the change stays inside what the testing supports. A new design with no test history normally needs testing first.

Coastal Texas has windstorm-designated catastrophe areas where certain exterior products need to be evaluated and listed for use. We prepare the submittal to the Texas Department of Insurance for manufacturers who sell into those areas.

Yes. Racking and roof attachments, PV modules and inverters, battery energy storage and balance of system equipment all go through certification and code review. UL listings and SRCC certification for solar thermal are part of the path we map for you.

Yes. The first step is a feasibility review that names the approvals that apply, the tests they require and the gaps in your design. You decide whether to continue after you see it.

Send drawings, specifications, any existing test reports or listings, the target markets, and the product's intended use. Tell us which approvals you want. We confirm the scope and what else we need.

Yes. We help manufacturers outside the U.S. understand which U.S. codes, listings and state approvals their product needs, and in what order to pursue them.

08Get started

Start your approval path.

Contact us to schedule your initial consultation and take the first step toward U.S. market entry.