Areas of expertise.

Designs tailored to ensure uninterrupted power supply during outages, keeping critical systems running when you need them most.
Integration of energy storage with solar PV systems for enhanced energy efficiency and self-consumption.
Accurate sizing of battery systems to meet your project's specific energy needs, ensuring cost-efficiency and optimal performance.
System design for large-scale commercial and industrial battery backup systems to fight demand charges and provide dependable backup power for critical systems.
What the plan set includes.
The kW and kWh calculation from your critical-load list or interval data, with surge checked for motor starts.
An updated one-line showing the battery, inverter, disconnects, overcurrent protection and the point of connection.
Where the equipment sits, the working clearances and the spacing the fire code reviewer will look for.
Equipment listing data, required labels and, for backup, the schedule of loads on the critical-loads panel.
Who this is for.
You sell the battery. We design it into the new or existing system so the permit package is complete.
Backup panel and critical-loads subpanel jobs that need sized equipment and a sealed one-line.
Facilities cutting demand charges or protecting critical loads, where interval data drives the design.
Larger projects that need storage designed alongside PV, with the structure and the code package together.
Why choose SunSmart for energy storage design?
Every project is unique, and our designs are customized to match your energy storage requirements, whether for residential, commercial, or industrial applications.
We prioritize safety, ensuring that all designs meet local regulations and industry standards for secure, reliable operation.
Our team is experienced in the latest energy storage technologies, including lithium-ion batteries, flow batteries, and hybrid systems.
With a focus on efficiency and longevity, we design systems that deliver consistent, dependable energy storage.
How it works.
Energy storage is transforming the solar industry, and SunSmart Engineering is here to help you stay ahead. Most of the work on your side is defining what the battery must do.
Backup, peak shaving or self-consumption. Each needs a different kW and kWh rating. Send the critical-load list or the utility interval data.
The address, the main panel and service rating, any existing PV inverter, and the battery and inverter models if you have chosen them.
We choose the coupling, size the system and check that the panel, busbar and inverter can accept the new equipment.
You receive stamped plans with the single-line diagram, layout and equipment data, ready to submit with the permit application.
If the building department, the fire reviewer or the utility has comments on our sheets, we answer them.
Codes and standards involved.
Storage has its own listing, fire and installation rules on top of the solar code. These are the ones that shape most designs.
Article 706 covers energy storage systems. Article 705 covers interconnected power sources, including limits on the panel's busbar. In the 2020 NEC, 705.13 covers power control systems.
PV rapid shutdown (NEC 690.12) and the storage disconnect requirements have to work together. We confirm with the authority having jurisdiction how it reads a combined system.
Look for UL 9540 on the system, UL 1973 on the battery and UL 1741 on the inverter. Large-scale fire test data (UL 9540A) affects spacing on commercial installations.
These limit where storage can sit and how many kWh can be in one place. Garages, utility closets and outdoor walls are the usual locations, and sleeping areas are not.
The 2020 NEC applies under the Florida Building Code, 8th Edition through December 30, 2026. The 2023 NEC applies under the 9th Edition, scheduled to take effect December 31, 2026. Florida does not enforce the 2026 NEC.
Problems we solve or prevent.
Busbar limits under Article 705 come up on tight panels. We check the options early, such as a power control system or a supply-side connection, before the customer is quoted.
Spacing and location rules vary by fire code. A layout that shows clearances and the equipment's listings avoids a redesign after submittal.
An air-conditioner compressor can pull several times its running current on start. We check surge capacity, not only the average load.
A DC-coupled battery on an old string inverter system can mean replacing equipment. We check what is installed before choosing.
The set shows the battery system's location and clearances, an updated single-line diagram, the equipment listings, the disconnects and labels, and the backup-load schedule if the system has one. It is sealed for the jurisdiction. The fire code reviewer and the utility may each ask for pieces of it.
We size the power rating (kW) to the loads that must start and run, and the energy capacity (kWh) to the runtime you promised the customer. For illustration, a critical-load panel averaging 1.5 kW for a 24-hour outage needs 36 kWh delivered, before we account for usable capacity and inverter efficiency. For peak shaving, we size from interval data, not monthly bills.
DC coupling usually fits new builds and arrays with high DC-to-AC ratios. AC coupling usually fits retrofits to an existing array, because the battery has its own inverter. We pick based on the existing equipment, the panel and the job the battery has to do.
Yes. We check the existing inverter, the main panel's busbar and the available space, then design the retrofit. A power control system or a supply-side connection can sometimes avoid a service upgrade.
Homeowners no longer have one: the §25D credit does not apply to expenditures made after December 31, 2025. Business-owned storage can still qualify under §48E, and it is not subject to the 2027 cutoff that applies to wind and solar. It phases down by construction-start year: 100% through 2033, 75% in 2034, 50% in 2035, then 0%. Check with a tax advisor for your project.
They apply to storage that begins construction after December 31, 2025, for projects claiming the §48E credit. The minimum material-assistance cost ratio for storage is 55% for 2026 starts and rises each year. Ask the manufacturer for documentation early, since the cell supplier matters.
NEC Article 706 covers energy storage systems, and NFPA 855 covers installation of stationary storage. In Florida, the 2020 NEC applies under the Florida Building Code, 8th Edition through December 30, 2026, and the 2023 NEC applies under the 9th Edition, scheduled to take effect December 31, 2026. Elsewhere, we use the edition your jurisdiction has adopted.
Yes, where the utility connection is costly or unavailable. For most projects, a grid-tied system with a battery gives the same outage protection at a lower cost, because it does not need days of autonomy or a generator.
Ready to add storage?
Confidently integrate energy storage into your projects with precise designs and expert support from SunSmart Engineering.

Storage guides.
Our battery storage design guide covers coupling, chemistry and sizing in depth. The credit guides cover what business-owned storage can still claim.
Guides & insights
Related articles
- How Do You Design Battery Storage for a Solar PV System?Battery Storage
- How Do Net Metering and Utility Interconnection Work?Solar Incentives & Economics
- How Much Does Solar Cost, and How Long Is the Payback?Solar Incentives & Economics
- Which Solar Tax Credits Are Still Available in 2026?Solar Incentives & Economics