Field notes and technical breakdowns from the SunSmart Engineering team, covering solar PV, energy storage, pools, structural design, and everything it takes to get a project permitted.
Start from the job the battery does (backup, peak shaving or self-consumption), then pick coupling, chemistry and size. Includes 2026 credit and code status.
Pick monocrystalline modules, match the inverter to shade and rapid shutdown, and read warranties for labor. Covers degradation, bifacial, MLPE and brands.
Net metering credits solar exports on the bill; interconnection is the utility approval to connect. See state differences, the Florida rule and the steps.
Design to the NEC edition your AHJ adopted: rapid shutdown, conductor sizing, voltage drop, labels and permits, with a worked example and OSHA fall rules.
Solar costs about $3.20 to $4.20 per watt residential and $2.00 to $3.60 commercial. See what drives cost, how to calculate payback and ROI, and financing.
A roof is ready for solar when an engineer confirms the framing, the roofing has years left and each penetration is flashed. Covers materials, leaks, liability.
A residential install takes 1 to 3 days, but permits, inspection and utility approval set the calendar. See phase timing, who services it and a handoff list.
Wind uplift usually governs racking, snow matters in cold climates, and ground mounts add soil and foundation checks. Rooftop versus ground, with Florida notes.
Divide annual kWh by site yield from PVWatts to get kW DC, then check tilt, azimuth and shade. Includes Orlando tilt data and a design-tool comparison.
The homeowner solar credit ended after 2025. Commercial and third-party solar can still claim 48E if they meet the 2027 in-service deadline and FEOC rules.
48E or 45Y?" comes up on almost every commercial deal. For most jobs the answer is simpler than people expect.
What if the rules change after I sign?" It is the question contractors ask most right now.