01Construction Services · Building Envelope

Windows, Doors, Roofing & Exteriors

SunSmart Engineering provides site-specific engineering for windows, doors, skylights, roofing and exterior products. Contractors, installers and manufacturers in Florida, across the U.S. and in the Caribbean send us the product approval, the opening and the address. We send back sealed wind-load calculations, product evaluations and anchorage details that a building department can accept. A product approval covers the tested condition. Real jobs rarely match it exactly, and we close that gap.

01

Site-specific evaluations.

Impact-rated windows and glass doors being installed on a new building
01
Product Resizing

When an opening falls outside the approved size limits, we analyze the product at the required dimensions and seal the result.

02
Wind Load Calculation & Verification

Design pressures calculated per ASCE 7 for your address, exposure, height, and zone, then verified against the product's rated capacity.

03
Alternate Installation & Anchorage

Substrates, edge distances, and existing conditions that do not match the tested anchorage get a designed alternate with a fastener schedule.

04
Mullion Design & Calculations

Mullions, receptors, and reinforcement sized for deflection and pressure across multi-unit and storefront configurations.

05
Glass Load Calculations

Glass type, thickness, and lite makeup evaluated per ASTM E1300 for the design pressures at the installation.

06
Roof Drainage & Roofing Calcs

Primary and secondary drainage, ponding checks, slope and scupper sizing, plus uplift and attachment analysis for roofing assemblies.

02

Missed inspections and after-the-fact fixes.

Engineer reviewing structural drawings on a job site
Failed or Missed Inspections

We evaluate the as-built condition, document what complies, and specify targeted remediation so the permit can be closed instead of reopened.

Unpermitted or Already-Installed Work

Field verification and engineering letters that give the building department a defensible basis to accept work that went in ahead of approval.

Product Substitutions

When the installed product is not the one on the approved plans, we evaluate the substitution and issue the documentation to reconcile it.

Affidavits & Engineering Letters

Signed and sealed letters for inspectors, insurers, lenders, and owners, written to answer the specific question being asked.

03

Product types we cover.

01
Windows

Single and multi-unit assemblies, impact and non-impact, new and replacement.

02
Doors

Entry, sliding glass, French, garage, and commercial storefront systems.

03
Skylights & Roofing

Skylights, roof assemblies, underlayment attachment, and drainage.

04
Exterior Components

Shutters, railings, cladding, awnings, and exterior attachments.

04

Who this is for.

01
Window and door installers

Replacement and new-construction work where the opening, the substrate or the pressure does not match the approval.

02
Roofing contractors

Re-roofs, skylights and roof-mounted equipment that need uplift, attachment or drainage checks.

03
Manufacturers and dealers

Product lines sold into Florida and the Caribbean that need site-specific evaluations beyond the listed sizes.

04
General contractors and builders

Storefronts, curtain wall sections and exterior attachments that a plans reviewer has questioned.

05

How an evaluation works.

Most jobs start with a rejected permit item or a mismatch found in the field. The steps below are the same either way.

01
Send the product and the opening

The product approval or NOA, opening dimensions, the site address, photos or a sketch, and any plan sheets or reviewer comments.

02
We set the design basis

Building height, exposure, risk category and the opening's location on the wall or roof, so the pressure is calculated for that exact spot.

03
Compare pressure to capacity

We check the required design pressure against the rated capacity in the approval, including size limits, glazing and anchors.

04
Engineer what the approval does not cover

Resized units, alternate anchors, mullion reinforcement or glass changes, with calculations and a fastener schedule.

05
Seal and deliver

You receive sealed calculations, details and any letter the inspector or building department asked for.

06
Answer review comments

If a reviewer comments on our sheets, we respond with revised details or added calculations.

06

Codes, standards and approvals involved.

The building department decides which rules apply to a permit. These are the ones that come up on envelope work most often.

ASCE 7 design pressures

Components and cladding pressures depend on location, exposure, building height, risk category and the zone of the wall or roof where the opening sits. Corner and edge zones carry higher pressure than the field.

Florida Building Code

The Florida Building Code sets the wind criteria for windows, doors, roofing and exterior attachments. The 8th Edition (2023) applies through December 30, 2026. The 9th Edition (2026) is scheduled to take effect December 31, 2026. Check which edition your permit application falls under.

Florida Product Approval

Statewide approval for products used in Florida. A product is approved by a validation method such as a test report or an evaluation by a Florida-licensed engineer, for stated sizes, anchors and design pressures.

Miami-Dade NOA and the HVHZ

Miami-Dade and Broward form the High Velocity Hurricane Zone, with stricter wind and roofing rules. Products there need a Miami-Dade Notice of Acceptance, and the NOA lists the limits you must stay inside.

Testing and glass standards

Product ratings come from lab testing for structural pressure and impact. Glass strength is checked per ASTM E1300. Our evaluations cite the test reports behind the approval.

Texas windstorm areas

Coastal Texas has its own product evaluation path through the Texas Department of Insurance. We cover that for manufacturers on our product certification page.

07

Problems we solve or prevent.

01
Permit rejected for pressure

The reviewer says the product rating is below the required design pressure. We calculate the real pressure for that opening and show where the product passes, or what has to change.

02
Opening larger than the approval allows

Size limits in an approval are firm. We evaluate the product at your size so the job is not stuck on a standard unit that does not fit.

03
Wrong anchors or weak substrate

Anchors tested in concrete are not the same as anchors in block, wood or an old frame. We design the attachment for what is actually there.

04
Failed final inspection

A substitution, a missing anchor or missing documents can stop a final. We document the as-built condition and specify the fix, so the permit closes.

+FAQ

Building envelope questions.

Have a different question?

That is a site-specific engineering evaluation. We analyze the product at the size and pressure your opening requires and issue sealed calculations and details that let the installation proceed. Whether the building department accepts it is their call, so we write the evaluation to answer their review comments.

Yes. When the substrate, edge distance, or existing conditions do not match the tested anchorage in the approval, we design an alternate attachment with a fastener schedule and document it for the building department.

Often, yes. We evaluate the as-built condition, document what meets code, specify remediation for what does not, and provide the engineering letter the inspector needs to close the permit.

We perform glass load calculations per ASTM E1300 and design mullions, receptors, and reinforcement for the design pressures at your site.

It covers the product as tested or evaluated: specific sizes, glazing, frame, anchors, substrates and a rated design pressure. Install it outside those limits and the approval no longer backs you. A site-specific evaluation covers the gap for that one job.

We calculate components and cladding pressures per ASCE 7 from the address, risk category, exposure, building height and the opening's zone on the wall or roof. We then compare that pressure to the rated capacity in the product approval.

Yes. Miami-Dade and Broward form the HVHZ, which has stricter wind rules and requires products to carry a Miami-Dade NOA. We check the approval, the pressure and the anchorage against those rules before we seal anything.

Send the site address, the product approval or NOA, the opening dimensions and a sketch or photos of the condition. Add the plans or permit comments if a reviewer already rejected the item. We confirm the scope and anything else we need.

08Get started

Get the opening approved.

Send the product data, the opening dimensions, and the site address. We will tell you what the evaluation requires.

Installed impact-rated window on a completed exterior