What we do.

Each request ends with a written report or letter that answers the exact question the reviewer, insurer or owner asked.
A licensed professional visits the job site and evaluates work quality, adherence to codes and any potential issues.
We review high-resolution photos of installations or completed work and give an expert analysis when a visit is not needed.
A professional, comprehensive letter of our findings for submission to insurance companies, property owners, building departments or other stakeholders.
Confirmation that an installed system, such as a solar array or battery, matches the approved plans and the attachment details.
Sealed letters on whether existing framing and connections can carry a new load, such as a solar array or rooftop equipment.
Evaluation of work that was covered or built before an inspection, based on photos, records and what can still be seen.
Who asks for them.
A reviewer wants proof that the roof can carry the array, or that the installed system matches the plans, before the permit closes.
Third-party documentation of completed work, attachment or storm repairs for an inspector or a carrier.
An independent evaluation of condition or workmanship to support a claim decision, a renewal or a dispute.
Written verification for a closing, a loan or a portfolio of properties, from someone with no stake in the sale.
How it works.
You tell us what the letter must answer, we gather the evidence, and a licensed professional writes the report.
Tell us the purpose of the evaluation: an insurance claim, a permit comment, project validation or a dispute. We confirm scope and whether photos are enough.
For photo evaluations, send clear images, the address, the permit number and the approved plans. For on-site inspections, we schedule a visit with one of our professionals.
We review the materials or the site and note any code concerns, missing information or areas of good workmanship.
You receive a report that summarizes what we found. Reports can include code compliance analysis, structural assessments, recommendations for repairs or improvements, and verification of quality and workmanship.
We answer questions, clarify the findings and help you act on any recommendations in the report.
Roof Letters: Order at RoofLetters.com
Roof certification and roof verification letters are handled by RoofLetters.com, our dedicated roof-letter division. It issues stamped roof letters for insurance and code compliance, runs virtual and on-site inspections, and creates plans for permits. It serves all 50 states. Use it when the question is about a roof.
Codes and approvals involved.
A letter is only useful if it addresses the standard the reviewer applies. We write to the code edition and criteria in force where the permit was filed.
The Florida Building Code, 8th Edition (2023), with the 2020 NEC, applies through December 30, 2026. The 9th Edition (2026), with the 2023 NEC, is scheduled to take effect December 31, 2026. Elsewhere, we use the edition your jurisdiction has adopted.
Attachment and framing checks use ASCE 7 wind pressures for the address, exposure and risk category. The HVHZ (Miami-Dade and Broward) adds stricter wind and roofing provisions.
Where a product is installed under a Florida Product Approval or Miami-Dade NOA, we compare the installation to the approved conditions and limits.
Each building department decides which letters, seals and formats it accepts. Tell us what the reviewer asked for and we write to that request.
Letters are signed and sealed by a licensed professional. Our Florida engineering firm authorization is COA35170.
Problems we solve or prevent.
A plan reviewer asks for an engineer's confirmation of the roof framing or the installed attachment. A focused letter answers that one question.
A missed inspection can stall a final. We document what can be verified so you and the building department can decide how to proceed.
Carriers want written third-party evidence of roof condition, repairs or workmanship before they renew or pay a claim.
A short photo checklist at intake means we can usually evaluate the first set you send instead of asking for more.
Our Commitment to Truth & Transparency
We understand the importance of third-party verification in achieving desired outcomes, but we uphold a strict commitment to honesty and accuracy. While we aim to support our clients' objectives, we will never fabricate or alter findings to misrepresent the truth.
We provide unbiased, fact-based assessments.
Our reports are rooted in a detailed understanding of industry standards and regulations.
Each evaluation is documented clearly and professionally, ready for submission to the appropriate parties.
A verification letter is a signed and sealed engineering letter that states what an engineer found on a site or in a set of photos. It might confirm that an installation matches the approved plans, that existing framing can carry a new load, or that completed work meets the code. Building departments, insurers, lenders and owners ask for them.
Not always. Some questions can be answered from clear, labeled photos and documents. Others need an on-site inspection, and we tell you which one applies when we scope the request.
Send the address, the permit number if there is one, and the approved plans. Add wide shots and close-ups of the area in question, with the key details in frame: attachments, labels, connections, spacing. Include the reviewer's or insurer's written request so we answer the exact question.
Often, yes. We evaluate the photos and records of the work before it was closed up, state what can be verified, and say plainly what cannot. The building department decides whether it accepts the letter.
The letter says what the evidence shows. We do not fabricate or alter findings. If something does not meet the code, the letter says so and, where possible, recommends the repair.
Timing depends on the project, on scheduling a site visit and on the documents you send. We confirm it when we scope the request.
We serve contractors, insurers and property owners nationwide and in the Caribbean, with Florida as our strongest market. RoofLetters.com covers roof letters in all 50 states.
No. A municipal inspection is the official sign-off for a permit. Our letter is third-party documentation that the building department, insurer or lender may accept as supporting evidence, depending on its own rules.
Get Started Today
Contact us to schedule your inspection or submit your photos for evaluation. SunSmart Engineering is here to provide the third-party verification you need with the professionalism and honesty you can rely on.
Related guides.
Read these before you order a letter. They explain what reviewers check and what usually triggers a request.